1. High heat efficiency, 90% of heat can be reused after the product be processed.
2. Temperature difference between the product and the heating medium is small, so the heating is gentle.
3. It is of high degree automatic, can automatically control the CIP cleaning, self sterilizing, and the whole procedures steps; all the procedures are recorded and controllable.
4. It is of precise and reliable sterilizing temperature control; all the affecting factors such as steam pressure, steam flow rate, product flow rate are all controllable.
5. Adopts advanced polish procedure, can perform fully cleaning, self sterilizing ensures the system at aseptic state.
6. The system is of high reliable, main parts such as product pump, hot water pump, all kinds of valves, elements of the electrics are all of world known brands.
Frequently Asked Questions
What information is needed to configure the UHT Sterilizer?
Please provide the beverage recipe, process flow, inlet and outlet conditions, required throughput, cleaning requirements, utilities and plant layout. HZM uses these inputs to define tanks, heat treatment, mixing, piping and controls. The intended application is thermal processing of juice, tea, milk-based and other beverage products.
How is the process configuration selected?
Product composition, viscosity, temperature, treatment time, hygiene target and downstream filling conditions determine the equipment and control strategy. The final process must be confirmed against the approved recipe and product standard.
Can the system handle different beverage recipes?
Multiple recipes may be supported through suitable tanks, controls and cleaning procedures. Ingredients, thermal sensitivity, allergens, particles and required changeover cleaning must be reviewed for each product.
Can this equipment be integrated into a complete production line?
Yes. HZM can coordinate upstream processing or bottle making with filling, labeling, coding, packaging, conveying and palletizing. Layout, utilities, controls, factory testing, installation, commissioning and training are defined by the agreed project scope.