Building a Water-Line Budget from the Production Boundary
A complete mineral-water line budget starts with the intended finished-water specification and the point where the project ends: sealed bottles, packed cases or finished pallets. These boundaries determine which equipment belongs in the estimate.

Account for site work
Add the utilities, drainage, installation and storage provisions required by the layout. Identify responsibility for source-water supply and treatment verification. Keep working materials and startup production costs separate from machinery purchases.
Size from the production schedule
Use the bottle mix, accepted output and available hours. Include cleaning and format changes when calculating usable capacity. A nominal machine rate and a generic capital ceiling cannot establish the cost of the complete plant.