Blow-Mould Changeover: Define the Complete Job
A mould change includes more than exchanging cavity parts. Cooling connections, stretch components, transfer settings and the selected recipe must all match the new bottle.
Measure time from the final accepted old-format bottle to the first accepted new-format production. Include safe isolation and sample checks. Record which parts and tools change so that a quick mechanical swap is not reported as the whole changeover.
Equipment details: Automatic Blow Molding Machine.

Need help planning your packaging line?
Share your product, bottle and capacity requirements for a practical equipment recommendation.