Insights & Updates

12000BPH Pure Water Filling Line Was Shipped to Ethiopia

By HZM 557 views

Good News! The customer form Ethiopia purchased a 12000BPH pure water filling line from our company in January 2020. We have arranged shipment as soon as possible to make sure our customer to receive products quickly.

In the past few days, our technicians are also checked all our machines to ensure that our products will maintain its best condition when it arrives in Ethiopia. We are also very grateful to our hard-working staff for their support of this export plan.

 12000BPH Pure Water Filling Line Was Shipped to Ethiopia

This is our old customer and we knew each other in an exhibition. We have been in cooperation relationship for years. The customer form Ethiopia owned a 15000BPH water filling line earlier and this is the second line to enlarge their production capacity. 

 12000BPH Pure Water Filling Line Was Shipped to Ethiopia

After few days' online communication, they decided to visit our factory in person. During their visiting time,we tried our best to arrange their trip and showed them our products to make them know more about our company. They also visited some other companies but finally they still chose us for further cooperation.

 12000BPH Pure Water Filling Line Was Shipped to Ethiopia

Zhangjiagang HZM Machinery has an international standard plant with an area of about 10,000 square meters. It is a comprehensive professional liquid beverage packaging machinery supplier, which integrates development, manufacture and sales. Welcome to inquiry us! 

Talk to our engineering team

Need help planning your packaging line?

Share your product, bottle and capacity requirements for a practical equipment recommendation.

Equipment for your project

Continue reading

2026-09-04

RO Differential Pressure Keeps Rising: Fouling Location Matters

Locate the stage where pressure loss is increasing and relate it to normalized flow and salt passage. A first-stage rise often points to particulate or biological fouling; a later-stage rise can indicate scale, but feed analysis is required. Follow this practical fault-isolation, repair and prevention guide for bottling-line operators and maintenance teams.

Learn more

2026-09-02

Why Do Filling Valves Drip After the Bottle Leaves?

Dripping usually comes from contamination on the valve seat, worn or swollen seals, trapped pressure, incorrect closing timing or product viscosity outside the setup window. Identify whether the leak follows one valve or the entire filler. Follow this practical fault-isolation, repair and prevention guide for bottling-line operators and maintenance teams.

Learn more

2026-08-28

Sleeve Labels Wrinkle After the Shrink Tunnel

Determine whether the sleeve was straight before entering the tunnel. Then check film shrink curve, tunnel-zone temperature, airflow or steam distribution, bottle moisture, conveyor speed and container geometry. Follow this practical fault-isolation, repair and prevention guide for bottling-line operators and maintenance teams.

Learn more

2026-08-23

Bottle Rinser Has Low Spray Pressure: Causes and Repair Steps

Check whether the loss affects the entire rinser or only several nozzles. System-wide loss points to supply, pump, filter or valve problems; a local pattern points to blocked nozzles, damaged tubing or a misaligned bottle. Follow this practical fault-isolation, repair and prevention guide for bottling-line operators and maintenance teams.

Learn more

Build your production line

Talk with an HZM beverage packaging specialist

Tell us your beverage, container, capacity and target market. Our engineering team will prepare a practical line proposal.

WhatsApp Email Facebook