The Equipment Between Source Water and a Packed Water Bottle
A water bottling project links treatment, container supply, rinsing, filling, capping, labeling and secondary packaging. Bottle blowing is needed only when containers are made on site; a purchased-bottle operation has a different infeed arrangement.

Identify each handover
Specify treated-water delivery to the filler, empty-bottle entry, cap supply and filled-bottle discharge. Assign responsibility for connecting conveyors and controls. These interfaces need dimensions and operating conditions, not simply a list of machine names.
Balance the units
Convert bottle output into water demand and pack output using the actual format. Include cleaning and changeovers in the production schedule. Acceptance should count released packages at the agreed line boundary so downstream losses remain visible.