2026-09-16
PET Bottle Base Is Deformed or Rocks on the Conveyor
Separate blow-process base defects from post-blow heat or handling damage. Check base heating, stretch-rod endpoint, mould-base position, cooling-water flow, ejection temperature and downstream guide pressure. Follow this practical fault-isolation, repair and prevention guide for bottling-line operators and maintenance teams.
Learn more